Request a quote Skip to content

← All products

Outdoor Fiber Optic Cable

GYTA53

Double Sheath Loose Tube Cable, 2-432 Fibers

Double-sheathed, double-armored loose tube cable for direct burial.

GYTA53 detail

Overview

What this cable is built for.

GYTA53 has two protective layers: a double plastic-coated aluminum tape bonded to a PE inner sheath for water resistance, then a corrugated steel tape bonded to a PE outer sheath. The loose tubes are stranded around an FRP or phosphate steel wire central strength member.

The double armor gives excellent crush resistance and effective rodent protection, so it is built for direct burial.

Key features

  • Aluminum tape inner sheath
  • Corrugated steel tape outer armor
  • Double PE sheath
  • Rodent protection

Applications

  • Direct burial
  • Long-haul
  • Interoffice

Specifications

Technical specifications.

Fibers 2–36Cable O.D 0.48 in (12.1 mm); Cable weight 103 lb / kft (154 kg / km)
Fibers 38–60Cable O.D 0.50 in (12.8 mm); Cable weight 118 lb / kft (175 kg / km)
Fibers 62–72Cable O.D 0.50 in (12.8 mm); Cable weight 118 lb / kft (175 kg / km)
Fibers 74–96Cable O.D 0.54 in (13.8 mm); Cable weight 132 lb / kft (196 kg / km)
Fibers 98–120Cable O.D 0.59 in (15.0 mm); Cable weight 155 lb / kft (230 kg / km)
Fibers 122–144Cable O.D 0.64 in (16.2 mm); Cable weight 175 lb / kft (261 kg / km)
Fibers 146–216Cable O.D 0.65 in (16.5 mm); Cable weight 174 lb / kft (259 kg / km)
Fibers 256Cable O.D 0.72 in (18.3 mm); Cable weight 208 lb / kft (310 kg / km)
Fibers 288Cable O.D 0.72 in (18.3 mm); Cable weight 210 lb / kft (312 kg / km)
Fibers 384Cable O.D 0.75 in (19.0 mm); Cable weight 230 lb / kft (342 kg / km)
Minimum bending radius Static12.5× OD
Minimum bending radius Dynamic25× OD
Tension allowed Short term674 lbf (3000 N)
Tension allowed Long term225 lbf (1000 N)
Crush resistance Short term171 lbf / in (3000 N / 100 mm)
Crush resistance Long term57 lbf / in (1000 N / 100 mm)

Ready to order GYTA53?

Send us your length, and project details. We come back with pricing and lead times.